Home Calendar Speedsters Event-Photos Engines Technical Construction John-Blacks-#917 WoodCars Model-A-Chassis Speedster-Design Survey Planking CNCRouter Model Strongback Strip-Building Orca Boat Shop The Stem Bottom Coat1 Coat2 Coat3 Starting MidWay Complete Sand Problems PreGlass Glassing Epoxy Sand Inside Glassin Hood Fender Fitting Structure Bodies Heads Carbs Water-Pumps HighPerformance RearEnd-Tranny Front-Ends Wire-Wheels Engines All-Vintage-Ford Clubs-Museums Racing Hill-Climbs Endurance-Runs GreatAmericanRace Historics Automobilia Organization ContactUs |
|
Mid Build |
|
It took about a month to do all the planking. I started September 20, worked 5 days a week and got the planking done by late October. |
|
|
|